West Jefferson Medical Center
All Star installed a powerful, integrated generator system to provide emergency back-up power for this 451-bed not-for-profit hospital and health services center. The $400,000 project was completed in 2007.
tag_error <txp:zem_article_image limit="15" break="li" /> -> : Function split() is deprecated on line 12

All Star installed a powerful, integrated generator system to provide emergency back-up power for this 451-bed not-for-profit hospital and health services center. The $400,000 project was completed in 2007.